Flipping the frame over again…
Cutting new floor sections.
Crossmember reinforcement added to help support the grey tanks.
Welding the axle mounting plate section back in place.
Floor pre fitting.
Elevator bolts installed temporarily for floor alignment.
Completing the “wire wheeling” of the chassis.
Completing the “wire wheeling” of the chassis.
Applying “metal ready” to the complete chassis, then rotated to allow drips to fall off & aid drying
Applying CPES to end grain & sides of floor panels
Frame completely painted with POR15
Painted frame & floor panels ready to be mated
Step rail outriggers during fabrication.
Applying “metal ready” to the complete chassis, then rotated to allow drips to fall off & aid drying
Applying CPES to end grain & sides of floor panels
Frame completely painted with POR15
Painted frame & floor panels ready to be mated
Step rail outriggers during fabrication.
Whew! Things are moving so fast I can barely keep up with the pictures!!
No comments:
Post a Comment