Monday, December 3, 2012

Catching up and Happy Holidays to all!

I think this catches me up! Colin didn't comment on it but I'm pretty sure the hold down plate in picture one is new and improved (much bigger than the original). Enjoy

Added small cross members to stringers at front of
chassis to help support potential battery placement.
These were made with the stringers that were
removed from the grey tank area.


Click image for larger version

Name: IMG_0623.jpg
Views: 15
Size: 152.5 KB
ID: 175379

Galvanized steel patches fitted to curbside wheel well.

Click image for larger version

Name: IMG_0624.jpg
Views: 13
Size: 125.9 KB
ID: 175380

Streetside wheel well patches.

Click image for larger version

Name: IMG_0625.jpg
Views: 12
Size: 117.5 KB
ID: 175381


Click image for larger version

Name: IMG_0626.jpg
Views: 13
Size: 121.5 KB
ID: 175382

Applied POR 15 to edges before patches are installed.

Click image for larger version

Name: IMG_0627.jpg
Views: 15
Size: 130.8 KB
ID: 175383

Floor panels fitted

Click image for larger version

Name: IMG_0628.jpg
Views: 18
Size: 129.7 KB
ID: 175384

POR 15 applied to surface rusted areas.

Click image for larger version

Name: IMG_0629.jpg
Views: 11
Size: 138.7 KB
ID: 175385

Click image for larger version

Name: IMG_0630.jpg
Views: 18
Size: 153.3 KB
ID: 175386

Rebuilt step functioning well.

Click image for larger version

Name: IMG_0631.jpg
Views: 15
Size: 108.1 KB
ID: 175387

Floor mounting holes drilled throughout.

Click image for larger version

Name: IMG_0632.jpg
Views: 17
Size: 120.6 KB
ID: 175388
_______________

No comments:

Post a Comment